Product Description
Secification of
moulds
1. The main components of perform molds :S**6 material (Sweden
ASSAB) , **8 or H*3. 2. The mold base: P*0, (Plate
method avoids corrosion efficaciously and assures long life service
of the perform molds).
3. Lead time for mould
3~7 Weeks;
4.
Product material: ABS, PP ,PC,PC+GF, PET,
PVC,HDPE etc
5.
Mould life time:
*****0~1,**0,**0 shots.
Mould
Features
1. No cutting of valve gate is employed to reduce the labor
cost.
2. Advanced hot runner system assures lower level of AA value.
3. Reasonable- designed cold water channels increase cooling effect
and shorten the cycle time.
4. Good vacuum stove is
imported for heat treatment of the components, which assures the
hardness of components HRC**-HRC*8.
5.HASCO,DME.MEUSBURGER,JIS
Standard
Our advantage
1. Capacity of Research and
Development
Everest has a powerful team for research and development, which is
capable of manufacturing the injection and die-casting molds with
one cavity to Multi- cavities. At the same time we can manufacture
perform molds especially according to customers' injection molding
machines. We also have the service to manufacture the products by
the moulds, such as electronic enlcosures, junction boxes, tool
case, equipment case,plastic parts,etc..
2. Advanced Processing Equipment
Many machine tools are imported from America and Japan, such as
Machine center, CNC lathers, EDM and so on. All of these increases
processing precision, good interchangeability and low
eccentricity
3. Perfect Inspection Method.
Inspection tools include projector, hardness tester, stress tester,
eccentric tester, electric balance and other inspection tools.
The screw neck is made and inspected strictly by the standard of
Coca cola and the screw neck has been up to the standard of Coca
cola.
4. After-Sales Service
Technologists professional in after-sales line and excellent credit
assures stable operation of the machines.
Process:
1. Quote
competitive price according to customer's detailed
requirement.
2. Sign
agreement.
3. Customer
T/T deposit to us to start to design mould.
4. Send
mould drawing to customer for confirmation.
5. Mould
design confirmed and start to make mould.
6. Make
mould trial during tooling time ( Which we get agreement with
customer).
7. Send
mould trial sample to customer for inspection. Or customer come to
our factory to inspect mould personally.
8. Customer
T/T balance to us after mould confirmed.
9. Deliver
mould after get balance
Country: |
China |
Model No: |
001
|
FOB Price: |
( Negotiable ) (Negotiable)
Get Latest Price
|
Place of Origin: |
Zhejiang, China |
Price for Minimum Order: |
- |
Minimum Order Quantity: |
1 Set |
Packaging Detail: |
wooden package |
Delivery Time: |
30 workdays |
Supplying Ability: |
100 Set per Month |
Payment Type: |
T/T, Western Union, PayPal |
Product Group : |
- |